Home > Reference List > NOVOLEGNO

NOVOLEGNO

Group FANTONI

CountryItaly
Year of construction1989

Combustion plant for wood waste. The plant consists mainly of a hot gas generator combined with direct heating flash dryer (MDF), a heating boiler for diathermic oil for the press line, and an indirect saturated steam generator .

ProductionPannelli MDF
Total heat20.88 MW
Thermal oil12 MW
Steam10 t/h
FuelWood waste, natural gas (stand by)
Grate Dimensions22.6 m2
Dust Burner/Natural gas-oil6 MW